A large Scottish based company came to us with a requirement for a shipping container that would be used on the production line as a maintenance facility.
We worked to customer drawings and fitted the unit out with steel checker plate flooring, 2no. small non-opening windows, personnel access door, large steel workbench, fire-proof curtain across the back with a steel table for a small welding area with ventilation points. Finished in the client corporate colours.
The client was very pleased with the final product and was delivered to site within 4 weeks from order confirmation.