Breakdown of the Project
We took a 40ft new ‘one trip’ shipping container and fitted out ready for client to install switch-room equipment.
The unit was fitted with various apertures on the side walls for air conditioning to be installed and apertures through the floor to allow for cable entry. The unit was partitioned internally to separate the switch-room gear from the general working environment. Personnel doors fitted to allow access to both sides. Lined internally with 10mm ply over 50mm Rockwool insulation. Electrics fitted throughout.
Delivered into Oxfordshire approx. 4 – 5 weeks after confirmation of order.