Breakdown of the Project
A local car manufacturer to our Sedgefield base required a container conversion solve an issue for sending parts off site to be shot blasted. To decrease production time, they wanted to bring this process on site and modifying containers to were the solution. We received detailed CAD drawings for a 20ft high cube new ‘one trip’ and a 40ft new one trip high cube tunnel container.
The containers were moved into our workshop and were modified separate to be joined later on site. The fabrication work included removing one side of the corrugated 20ft side as well as 20ft corrugation from the 40ft tunnel container. Further modifications included a medication to the cargo doors on the 40ft for safe exit for employees and a personnel door installed in the 20ft containers 8ft corrugated panel. Along the remaining 40ft corrugated panel we installed 4no. 1000mm x 1000mm vents to increase ventilation during the shot blasting process. Along the top of the containers there was additional brackets attached and specified at 10ft intervals that will have railings attached later onsite by the customer.
The customer and their team met us onsite, where they brought their parts to build their shot blasting facility inside the container. Once every part was installed the containers were transported to site using our local haulier after they had to go through a safety and site survey and provide the various documentation before they were able to deliver.
Onsite we were unable to use welding equipment onsite due to safety procedures, so the containers were bolted together and a rubber gasket was installed to prevent any water ingress. The conversion was completed in 4 weeks from confirmation of order.
For shipping container conversions please see our previous projects that we have completed for many different industries. Email us your specification to enquiries@containercontainer.com or contact us over the phone on 0844 561 79 75 and speak with our team about your requirements.